Retrofitting of LPG Plant

Problem/Scope:

  • A set of R.C.C. frames to support pipelines showing signs of disintegration
  • Immediate solution needed to prevent collapse or further disintegration

Constraints:

  • All construction work to be carried out with plant under running conditions
  • Rules out any welding on site
  • Existing structures can't be disturbed/ replaced

Recommendations:

  • Structural steel retrofitting
  • Requires minimum disturbance to the existing structure
  • Major part of the work can be done offsite

 

Solution:

 

 

 


 